Finally, landed myself a big role on the sideline. This time, I need to plan and create a machine maintenance schedule from May 2010 onwards for the year of 2010. In simpler words, there are 7 maintenance tasks for which 4 of them are carried on more regular basis and I need to arrange it so that no assembly line has a maintenance task overlooked. These combination of preventive and predictive measurements will ensure the assembly line optimum operating environment with less likelihood of breakdowns